Back

Task Based Risk Assessment Review - Per Task Reviewed


R2644.50 Excl VAT
How to qualify for a discount?



Specifications

  • Formal task risk assessment (TRA) review
  • Order to be populated with 10% of the total number of tasks on the risk assessment
  • Customised to include company logo details
  • Task reviewed to confirm relevance and currency of present hazards, risks and their associated control measures
  • Completion of Planned Task Observation report
  • Completion of Control Measure Checklist during the Planned Task Observation
  • Item delivery: usually 10 - 15 working days
WHY IS THE TASK-BASED RISK ASSESSMENT REVIEW REQUIRED? 
The Risk Assessment Review is important for the purpose of confirming whether Risk Control 
Measures have been implemented and are effective towards the management of risk exposure 
related to the specific task in the workplace.  
WHY IS THE TASK-BASED RISK ASSESSMENT REVIEW IMPORTANT? 
The Task-based Risk Assessment review enables the employer to make sound judgements on the 
improvements to be undertaken for the minimizing or elimination of risk in the workplace as is 
required by the Occupational Health and Safety Act 85 of 1993. The review is not only required 
when a process has changed or new equipment is introduced, but also once an incident and/or 
accident has occurred related to the task, which shows that current controls have failed, or are in 
danger of failing. 
VALIDITY 
All risk assessment reviews need to be documented by means of the completion of a control 
measure checklist and Planned Task Observation Report, which must then be kept in the Health 
and Safety File of the company for future reference as well as for viewing by the relevant 
stakeholders with the interest of Health and Safety at work.  

    Add a review

    Online Health and Safety Shop